The Joint Debugging and Commissioning of Xi'an-Chengdu High Speed Railway in Sichuan Section Started
2017-07-14

"Dragon" Flying from Aerial View with High Definition

At 8:40 am on July 3, an EMU comprehensive test car pulled out from the Jiangyou Railway Station, marking the start of joint debugging and commissioning of Xi'an-Chengdu High Speed Railway in Sichuan Section. The official opening also entered the countdown.

As a rule, before each new railway line is opened, the railway department will organize specialized inspection vehicle to conduct a full range of tests on all railway equipment. The railway can only be opened and operated after passing the joint debugging and commissioning test.



The section of joint debugging and commissioning test started from Jiangyou to Guangyuan. The test items include track, roadbed, bridges, response of train aerodynamics, traction power supply, communication, signal, passenger service systems, natural disasters and intrusion detection system.

 

 

 

It is understood that after the completion of Xi'an-Chengdu High Speed Railway in Sichuan Section, it would take only three hours from Chengdu to Xi'an. Isn't it excited to "stroll and eat" all the way? Our editor will show the travelling strategy.

Eat, drink, play and make merry

Along with the Xi'an-Chengdu High Speed Railway, there is full of delicacy and beauty: Qin imperial mausoleum, Wuhou Temple, Apang Palace, giant panda, pita bread soaked in lamb soup, malatang... For everyone, the opening of the high-speed rail shortened the time of journey.